See the product
A 30-minute slot on the live stand, on your own: the operator interface plus a camera on the physical wall.
Use this page to prepare a demonstration stand or a proof of concept on your own hardware. The technical checklist, source preparation and acceptance criteria apply to both. The scope, server and participants are agreed at the start of each project.
Perpetual licence: €2,500 per server. Capacity depends on the GPU, video outputs and source workload.
Updated:
A proof of concept installs Craft Wall on an agreed server, connects real sources and checks the operator workflow against written criteria. It ends with a review of the results.
A 30-minute demonstration on our stand answers most questions. Choose a proof of concept when the decision depends on your sources, your network or your acceptance procedure.
Duration, server and participants are agreed at kick-off. The plan below is the default sequence; remove the steps that are out of scope.
Prepare the stand before the engineer joins. Every item maps to a step in the plan below.
Send the source list before the session so the engineer can prepare scenes. Do not send passwords by email; agree a secure channel for credentials.
Describe the scenes you need: routine monitoring, shift handover, incident review, meeting. Name the operators and their roles.
| Source type | What to prepare |
|---|---|
| IP cameras (RTSP, RTMP, HLS, SRT) | Stream URL, credentials, codec, resolution and frame rate. Confirm that the server can reach the camera or the VMS. |
| NDI and NDI HX | Sender names and the network segment. The server must be able to discover the senders; agree the discovery setup with the engineer. |
| HDMI and SDI capture | The device to be captured, its resolution and refresh rate, the cable and the capture card in the server. |
| Web pages and dashboards | URL, login method, session lifetime and refresh behaviour. Check whether a dedicated account for the wall can be created. |
| RDP and VNC | Host address, account and resolution. Confirm that the security policy allows a persistent session. |
| SIP and H.323 conferencing | Endpoint or MCU address, registration details and a test call partner. |
| Documents and video files | File formats and a storage location the server can read. |
| OSD labels and tickers | The text or data feed to display and where it should appear on the wall. |
Eight steps, run in order. Each step produces a record: what was connected, what was measured and what remains open.
Record measured values, not target values, in the protocol. This page does not set a guaranteed recovery time or capacity figure; those come from your test.
The proof of concept and the later delivery hand over the following materials.
| Stage | Materials |
|---|---|
| During and after the proof of concept | Source and scene inventory; test protocol with measured values and open items; written summary of results with the recommended server configuration; datasheet (PDF) and TCO whitepaper (DOI). |
| With the licence | Perpetual licence per server; first year of updates; Linux installation guide and reference server specifications; optional annual support. |
| With the preconfigured server | Hardware with the operating system installed and hardened; Craft Wall installed; burn-in and acceptance test results; 12-month hardware warranty with a three-year option; remote or on-site commissioning. |
Read the datasheet or the TCO methodology before arranging a demonstration.
A 30-minute slot on the live stand, on your own: the operator interface plus a camera on the physical wall.
Share the display layout, sources and requirements. We will discuss the configuration and prepare a quote.
For integrators and resellers evaluating software for customer projects.